JORDANELLE DAM CONSTRUCTION IS IN ITS SECOND SEASON IN WASATCH COUNTY, WITH MUCH WORK AHEAD THIS SUMMER. GRAVEL AND SAND ARE BEING SEPARATED AND DE-WATERED AT THE SCRAPED "STAGING AREAS" FOR LATER USE IN THE ACTUAL DAM. HIGHWAY RELOCATION BEGAN IN 1987 ON SEGMENTS OF U.S. 40 AND U.S. 189 THAT WILL BE INUNDATED BY THE 3,068-ACRE RESERVOIR. THE CONTRACT FOR THE ACTUAL DAM CONSTRUCTION WILL BE NEGOTIATED IN 1989.