The Utah Department of Transportation has opened bids to resurface sections of three highways in Orem and Springville.

In Orem, Eighth North (U-52), from the Geneva Road to State Street (U.S. 89) will be paved. The Springville roads to be resurfaced are U-75, from the D&RGW Railroad overpass to the junction of U.S. 89, and Fourth South from I-15 to the Union Pacific Railroad tracks.The work should be done by June 15.