Easing congestion: FrontRunner South progresses as crews unveil rail addition
LEHI — One small step for Utah Transit Authority, one giant leap toward easing transportation congestion along the Wasatch Front.
Monday afternoon, UTA crews showed off their newest mile-long rail addition near the future Lehi station on the FrontRunner South line, which will eventually run from Salt Lake City to Provo.
The 45-mile commuter rail line, which parallels the Union Pacific tracks through the two counties, is slated for completion no later than 2015.
FrontRunner North, which shuttles riders from Salt Lake City to Pleasant View, is already in service.
UTA projects that FrontRunner South will have about 7,500 riders when it opens, but will expand to nearly 13,500 riders per average weekday by 2030 — roughly 330,000 trips each month, said Gerry Carpenter, UTA spokesman.
The south line has proposed stops in Murray, South Jordan, Draper/Bluffdale, Lehi, American Fork, Vineyard, Orem and Provo.
The Lehi station, nestled in the backyard of Thanksgiving Point, has the park-and-ride on the east side of the tracks, with the platform in the middle of the two UTA lines, Carpenter said. The only other station set up that way is in Farmington, where an above-grade bridge was constructed.
Because of that, crews are building an underground pedestrian tunnel to get from a car to the train.
However, that construction can't be done with UP freight trains rumbling overhead.
So, crews created a "shoofly," an old railroad term for a detour, and will move the UP train onto the new UTA shoofly line while they work on the tunnel, Carpenter said.
The nearly mile-long detour track will allow UP trains to keep running during construction in that area, which should be about four months, said Matthew Carter, FrontRunner South project director.
Dan Harbeke, Union Specific director of public affairs, said the railroad is excited about the south line after seeing the success of the north line. And thanks to the shoofly, UP work won't be stalled during the construction process.
Once that section of the tunnel is done, UTA crews will rebuild the UP track over the tunnel and the shoofly will eventually be connected to the rest of the line. The pedestrian tunnel will be finished when crews work on the platform.
"UP has put forth a tremendous effort of coordination with us," Carter said. "We have to have a lot of effort on their side to make something like this happen."
The $850 million bill for FrontRunner South is split by UTA and Utah County, with the county using voter-approved sales tax bonding and UTA using sales tax, fare revenues and other sources, Carpenter said.
Although the original deadline was 2015, Carpenter said work is ahead of schedule and the line could be operating by 2013.
"We are working full-speed ahead on this," he said.
Provo is coordinating with other cities to submit "quiet zone" applications to the Federal Railroad Administration, and Carpenter said he expects all 45 miles of the south line to receive that status, just like the north line.
E-mail: sisraelsen@desnews.com
Recent comments
You lived in Boston. There is no point in comparing Eastern commutes...
to: Conserv Mass Transit Fan | July 8, 2009 at 10:51 a.m.
I agree with those who say this is nothing but an additional...
Keith | July 8, 2009 at 12:09 a.m.
For a decade in Boston I rode commuter rail daily, with a pass...
Conservative mass transit fan | July 7, 2009 at 9:01 p.m.
- Alabama rallies past Auburn 6:48 p.m.
- Five charged in cyber casino case 6:45 p.m.
- Cave to be sealed with body inside 6:08 p.m.
- Sports reflect, affect ethics 5:04 p.m.
- Common phrases rooted in scripture 5:04 p.m.
- Season in bloom with the Jesse tree 5:04 p.m.
- Sermons give time, place for tattoos 5:04 p.m.
- Muslims quick to respond to Ft. Hood 5:04 p.m.
- Utah religion in the news 5:04 p.m.
- 5 'house church' leaders sentenced 5:04 p.m.
- BYU would like friendlier rivalry
263 - Protests against Phoenix LDS temple
211 - RSL wins MLS Cup on penalty kicks
202 - Bronco, Kyle rubber match
139 - Thunder rolls by Jazz
136 - Letters: Rushing to judge Palin
133 - Boys basketball rankings
127 - Editorial: Poor welcome for Palin
112 - Man trapped in Nutty Putty cave dies
106 - Hall, Johnson matchup key
102
I wanted to tell them not to go. I dropped subtle hints. "My money is on...
When I was a kid, I worshipped my grandpa. He was undoubtedly my hero....
I think Brother Coppin's articles are much better when he stays away from...
are for trading insults. We all need to get a bit thicker skin while at the...
Nice. Could not get into the cool clubs so you start you own. I give them an...
I never thought Nutty Putty was dangerous. I went there 3 times as a...
Can't they jackhammer the walls of the cave to get him out? I'd want him...
For the sake of us football fans that have historical perspective please be...
What a great story. I've had the opportunity to watch one of these young men...
The increasing profane behavior, trash talk, and hate (by far too many on...
What a newswothy and valiant effort. Not!
The cave is not being sealed because of the possibility of future accidents;...



