From Deseret News archives:

UDOT to close offramp from I-15 in Farmington

Published: Wednesday, Sept. 17, 2008 12:16 a.m. MDT
 |  E-MAIL | PRINT | FONT + - 
FARMINGTON — For the next three weeks, northbound motorists will be intermittently barred from exiting Interstate 15 at exit 332.

The Utah Department of Transportation says it needs to close the offramp for reconstruction of the ramp, frontage road and southbound ramp to I-15.

Starting today at 8 p.m., UDOT will remove the top layer of asphalt for about a quarter-mile. A second phase of the project will be the application of a "microsurface" to the roadway, which requires warmer temperatures, meaning the exit ramp will close during the day.

Alternate routes into Farmington include Parrish Lane, and the northbound frontage road and Park Lane. Electronic message boards will provide updates on progress. Some lane restrictions also may be established.

Comments

You can be the first to comment on this story.

previousnext

Latest comments

Top 5 Players in minutes played: Utah 1 Fr, 2 Jr, 2 Sr Jr Carlon Brown...

Yep "self righteous" if the rest of us who don't rubber neck left, you would...

Jazz notes: 15th most-valuable team

Thank you for keeping the team here for all of these years, and for always...

Jazz fall apart late at L.A.

of misery, inconsistency, road games losses and of course, NO TITLE ! Long...

Glad to hear about Matt and the others who demonstrate you can play at a high...

I guess they forgot that God made clothes for Adam and Eve and that was...

and good luck.

Panel passes BCS playoff bill

There is an inherent problem in any rating system -- it takes into account...

Give Phillips some credit. He was 5/5 in field goals in the YBU game, and the...

Letters: Earth at center?

Mr. Bender's kind of thinking doesn't even acknowledge that the world is...

Advertisements